Helping Build the Future of Innovation: the Malachowsky Hall for Data Science and Information Technology

Construction on the impressive Malachowsky Hall for Data Science and Information Technology began in 2020 and was completed in just two years, following a fast-track schedule. Our team played a vital role by providing the foundation materials, including over 400 auger cast piles, and constructing the building’s concrete frame. Currently, we are focused on finishing the sidewalks and other outdoor features around the new building.

Our expertise ensured a sturdy foundation for Malachowsky Hall. We installed over 400 auger cast piles to create a stable base for the building. The concrete frame we constructed provided essential support for the multiple floors and intricate design of the hall, ensuring its structural integrity.

We are currently working alongside other crews to complete the sidewalks and outdoor features surrounding Malachowsky Hall. Our aim is to make the building easily accessible and visually appealing. We pay attention to every detail to create a seamless integration between the hall and its surroundings, enhancing both functionality and aesthetics.

The successful completion of Malachowsky Hall within the accelerated timeline is a testament to the exceptional efficiency and expertise demonstrated throughout the construction process. Our collaborative efforts, combined with the construction team’s dedication, have transformed a visionary concept into a tangible reality. This achievement solidifies Malachowsky Hall’s position as a symbol of innovation and progress in data science and information technology.